Historic event: One-year 1 megawatt E-Cat trial completed

AN IMPOSSIBLE INVENTION

Drawing of the 1MW plant. Drawing of the 1MW plant.

On February 17, 2016, a 350-day commercial test of a one megawatt heat plant based on Andrea Rossi’s E-Cat was completed. The event must be considered historic since it’s the first time an industrially useful amount of energy is produced over such a long time from this kind of yet unexplained radiation-free nuclear reaction—LENR or Low Energy Nuclear Reactions.

To be clear, the report from the one-year trial, which has been controlled by a major independent third party certification institute, will be released only in about a month, and until then no official information is provided on the test result. However, multiple sources have told me that the test has been successful.

Earlier, some sources having visited the test plant told me that the COP, Coefficient of Performance, i.e. the ratio between output power and input power for control, was in the range 20—80, meaning that the…

View original post 261 more words

Advertisements

Tell me (anonymous OK)

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s